Skip to content

ILLUSTRATIVE · NASA / SVS · NOT ADITYA-L1 DATA

Adjudication record

Engineering provenance

Six times, execution falsified the written specification. Each was measured, adjudicated, and folded into a versioned contract. Nothing here is summarised — every ruling below is the text the owner actually wrote.

What is this?

The engineering record: every time the implementation contradicted the written specification, and how each was ruled on.

Why should I trust it?

Each ruling is reproduced as its author wrote it, parsed from the committed adjudication files. The declined amendment and the clause that remains open are published alongside the closed ones.

Where can I verify it?

Contradictions
6
Resolved
5
Still open
1

Contract at r6. An open question is shown as open; it is not resolved by going unpublished.

The record

  1. CONTRADICTION-001Closed→ spec r1

    Frozen contract rule F-09 rejects valid archive data

    Implementation proved a frozen-contract rule impossible to satisfy. RESOLVED by spec r1.

    artifacts/v2/phase05/CONTRADICTION-001.md

  2. CONTRADICTION-002Closed→ spec r2

    §2.1's missing-value clause is factually false

    Contract §2.1 missing-value clause falsified by the real archive. RESOLVED by spec r2.

    artifacts/v2/phase05/CONTRADICTION-002.md

  3. CONTRADICTION-003Open· contains a declined amendment

    §7's spectrum-integrity tolerance is falsified

    Contract §7 spectrum-integrity rule falsified by the real archive.

    artifacts/v2/phase05/CONTRADICTION-003.md

  4. CONTRADICTION-004Closed→ spec r4· contains a declined amendment

    two HEL1OS parser-level rules are falsified

    Two §2.x parser-level rules falsified by real HEL1OS data. RESOLVED by spec r4.

    artifacts/v2/phase05/CONTRADICTION-004.md

  5. CONTRADICTION-005Closed→ spec r5· contains a declined amendment

    the archive-wide build falsifies three frozen rules

    Archive-wide build falsified three frozen rules. RESOLVED by spec r5.

    artifacts/v2/phase05/CONTRADICTION-005.md

  6. CONTRADICTION-006Closed

    two §2.8 HK checks falsified by the archive-wide rebuild

    r5 rebuild surfaced two more §2.8 HK checks. RESOLVED: Defect A implementation-only fix approved; Defect B not approved (working as designed).

    artifacts/v2/phase05/CONTRADICTION-006.md

Contract evolution

Each revision was forced by a specific falsification. The contract did not drift; it was amended, on the record, with a reason.

  1. r1

    CONTRADICTION-001

  2. r2

    CONTRADICTION-002

  3. r3

    No contradiction recorded against this revision.

  4. r4

    CONTRADICTION-004

  5. r5

    CONTRADICTION-005

  6. r6

    No contradiction recorded against this revision.